Hopper Creek Path Project
General Description of Work: Remove and replace approximately 900 linear feet of+/-six-foot wide asphalt path with an eight-footwide 4-inch thick, reinforced, colored concrete path, matching grade and alignment of the existing path along a segment of Hopper Creek Path.
Contract Documents
(click to expand/collapse)

Name | Size | ||
Hopper Creek Path School to Yount Notice to Bidders 01-24-20 | 2.0 MB |