Skip to main content

Hopper Creek Pedestrian Bridge and Path

Construction of a new multi-use path including: • General Work: Mobilization, traffic control, clearing and grubbing, erosion/water pollution control, tree, stump, and landscaping removal.Improvements: Minor grading, Class 2 base, concrete curb, colored-concrete sidewalk, access ramps, concrete retaining curb, percolation trench, fencing, +/- 80-foot long pre-manufactured pedestrian bridge (supplied by contractor), concrete bridge abutments and finish landscaping.
Filetype Icon Name Size Quick Download
2.7 MB Download
Filetype Icon Name Size Quick Download
364.4 KB Download
Filetype Icon Name Size Quick Download
90.5 KB Download