Oak Circle Rehabilitation Project (MT-3020)
The work in general consists of asphalt repairs, including: cold planing existing asphalt; hot mix asphalt (HMA) paving, traffic striping, lowering and adjusting utilities, traffic control, water pollution control plan, and related items of work as shown on the plans, as specified in the Standard Specifications and these special provisions, and as directed by the Engineer.
Status
Bidding Closed
Prebid Date2/6/20 2:00pm
Bid Date2/20/20 2:00pm
Company & Contacts
City of Yountville
John Ferons 707-944-8851
Location
Yountville, CA
Engineer’s Estimate: $385,000.00